Gf finished grade.
Finished floor elevation bf. Far face finished floor factory finish ffe. An unfinished or flood resistant enclosure usable solely for parking of vehicles building access or storage in an area other than a basement area is not considered a building s lowest. Board foot back face bottom face both faces boiler feed. Typically the building s finish floor elevation height of the floor is established from the civil drawings by the surveyor.
Once the finish floor elevation is established the other project elevations are based off the finish floor. Variations in elevation due to differences in finish materials but not more than 1 2 inch 12 7 mm. Finished floor elevation ffe lowest floor. Frequently on contract drawings plans sections and elevations finished floor level may be abbreviated ffl 27 000 the figure suffixed denoting the level in metres above a defined datum level usually outside ground level or ground floor level.
Flat head machine screw. Ff finished floor. Exterior decks patios or balconies that are part of type b dwelling units have impervious surfaces and that are not more than 4 inches 102 mm below the finished floor level of the adjacent interior space of the dwelling unit. Finished floor elevation ff e.
Finished floor line fgl. The elevation certificate provides a way for a community to document compliance with the community s floodplain management ordinance. Typical usage is no component of a hanging light fixture to extend below 7 0 a f f above finished floor. It can also mean backfill but it s higher than the top of the foundation wall.
Tf top of foundation. Reference plane as it s name implies is the top surface of the finished flooring material. Also referred to as ff is finished floor elevation. The lowest floor of the lowest enclosed area including a basement.
Fire hose cabinet fhms. Finished floor f f elevation is a reference plane used as a zero point for vertical dimensions. To obtain the elevation of the lowest floor including basement of all new and substantially improved buildings and maintain a record of such information. The floor above may be ffl 31 000 and the floor below ffl 23 000.
Fixtures furnishings equipment ffl. The term ffe refers to the top of the structural slab and its elevation above sea level. Can t help with that one. The finish floor is then considered ff 0 0.