Flashing Where Siding Meets Stone
Install the water resistant barrier to overlap the top edge of the weep screed.
Flashing where siding meets stone. Install the lathe and stucco to the first bend in the weep screed. Then flash again on top of the stone out to about 1 2 inch beyond the siding. Run the l shaped flashing up under the bottom row of siding so that it tucks under the final bottom row and on top of the wall and on top of the last row of bricks before you cap it with the cap. Install the kickout flashing.
Install a flashing across most of the top of the stone and up at least three inches behind the siding. This aritcle describes the cause repair and prevention of leaks rot damage at a wood framed wall that was not properly flashed and sealed at the wall bottom. Then purchase a stone lentil that is pitched on the top and cement it into place on top of the new flashing. Stucco cladding install self adhesive flashing behind the weep screed a perforated metal strip at the base of the exterior walls at the height above grade specified by the local building code.
Wall or siding connection to foundation top porch floors slabs. Kickout flashing installs just like standard step flashing except that half of the kickout flashing hangs over the edge of the roof.