Flashing Where Two Roof Lines Meet
The metal flashing is formed with a hook edge and cleated on 12 centers the flashing extends up the wall at least 4 the flashing extends onto the roof a minimum of 2 inches 4 inches is preferable in more severe climate areas.
Flashing where two roof lines meet. Place the 2 by 4 inch piece of lumber along the center of the flashing. Step flashing protects the joints between the roof deck and chimneys or dormers. Position the flashing between the two roof pitches. Install valley battens on both ends of the roof valley then attach first flashing 3 4 inches over the roof flange and another 3 4 inches over the fascia if any is present.
Now nail this first flashing at both its far ends. Remember to caulk the underside of the flashing with a sealant. This material is available with a v or w shaped profile and is placed over the top of the building felt before the roof s finishing material is installed. Valley flashing protects the valleys where two roof planes meet.
Slide the right edge of the flashing under the highest roof pitch. Flashing is critical to certain areas of your roof namely the places where the roof surface meets a wall sidewalls and front walls the low points where two roof slopes meet called valleys roof protrusions bathroom kitchen vents skylights and the roof s edges rakes and eaves. Types of roof flashing. Roof flashing is a thin material usually galvanized steel that professional roofers use to direct water away from critical areas of the roof wherever the roof plane meets a vertical surface like a wall or a dormer.
A common problem area is the point where a gutter dies into an adjoining wall as the photo below illustrates. At the bottom of the roof water needs to be directed. Flashing is installed to surround roof features such as vents chimneys and skylights. Flashing joints are lapped 6 in the direction of water flow.
Step flashing protects the gap where roofs meet walls by weaving into the roof shingles.